Newport Force Main Condition Assessment
This project consists of assessing the Newport Trunk Force Main along Pacific Coast Highway between 61st Street and Dover Drive in the City of Newport Beach. The assessment was done in two phases; the first phase consisted of using technology such as “smart ball” testing and CCTV. The second phase build access ports to physically inspect the line and determine the condition. Following the assessment a rehabilitation plan will be developed.
Assessment work took place in September and November 2009.