Current Construction

Print
Press Enter to show all options, press Tab go to next option

ANAHEIM / FULLERTON

FOUNTAIN VALLEY 
Wastewater Reclamation Plant No. 1   

  • Sludge Dewatering and Odor Control at Plant No. 1
  • Fleet Services Building Rehabilitation

HUNTINGTON BEACH 

Wastewater Treatment Plant No. 2

  • Sludge Dewatering & Odor Control at Plant No. 2
  • Outfall Low Flow Pump Station
  • Primary Treatment Rehabilitation
  • Groundwater Replenishment System Final Expansion

SEAL BEACH / WESTMINSTER

YORBA LINDA / ANAHEIM

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer